The  group  boasts of fabrication & erection
of critical ducting for Desulpharisation Plant
of  Technical  unit V (500 MW) at Trombay,
with Absorption Tankers of 32 meter height
& a handling capacity of 800 N/M3 per hour
& within the strict  schedule  of completion. 
The system was fabricated out  of  IS 2062 
material with complete FRP inside lining of
3mm thickness & by process  designed by 
"FLAKT" Norway, under inspection of TATA
Consulting Engineers. The  above  is one of 
the critical parts of this system.

Another part of the Desulpharisation plant
of   TEC, at   Trombay,   unit    V    under
fabrication.


A part of gas blower section of ( 500 MW )
in Desulpharisation plant.